How to make a gantt chart
-
Paste your data
Paste cells from a spreadsheet or upload a CSV with a text column for Task, a date column for Start and a date column for End, plus a text column for Group if you have it.
-
Check the columns
The gantt chart picks its columns for you. Change any of them under Data.
-
Style it and download
Under Style, pick a look, colours, background and size, add a title and source, then download SVG or PNG.
What is a gantt chart?
A Gantt chart draws each task as a horizontal bar running from its start date to its end date on a shared time axis. It shows schedules, durations and overlaps in a project plan.
How to read it
A bar's left edge is the start, its right edge the end and its length the duration. Bars that line up vertically run in parallel; colour shows the group or workstream.
When to use it
Plan tasks against time and see where they overlap. It is one of the change over time charts, which show how values rise, fall and repeat over time.
For single-date events rather than durations, use a Timeline. For numeric values over time, a Line chart or Column timeline applies.
Tips for a better gantt chart
- Give each task a start and end date, and an optional group column for phases or owners.
- Order tasks in the data by start date so the bars descend like a staircase.
- Keep task names short so the label column does not squeeze the timeline.
Data you need
One row per item with a text column for Task, a date column for Start and a date column for End, plus a text column for Group if you have it. Column names can be anything; the chart maker matches columns by type, and you can change the match under Data.
| Task | Start | End | Phase |
|---|---|---|---|
| Discovery workshops | 2026-09-07 | 2026-09-25 | Strategy |
| Content audit | 2026-09-14 | 2026-10-09 | Strategy |
| Brand identity | 2026-09-28 | 2026-11-06 | Design |
| Wireframes | 2026-10-12 | 2026-11-06 | Design |
| Copywriting | 2026-10-26 | 2026-12-11 | Content |
| Visual design | 2026-11-02 | 2026-12-04 | Design |
| CMS setup | 2026-11-16 | 2026-12-18 | Build |
| Front-end build | 2026-11-23 | 2027-01-22 | Build |
Other charts for the same data
More change over time charts
Questions, answered
- What is a gantt chart?
- A Gantt chart draws each task as a horizontal bar running from its start date to its end date on a shared time axis. It shows schedules, durations and overlaps in a project plan.
- How do you read a gantt chart?
- A bar's left edge is the start, its right edge the end and its length the duration. Bars that line up vertically run in parallel; colour shows the group or workstream.
- How do I make a gantt chart?
- Paste your data into the chart maker with a text column for Task, a date column for Start and a date column for End, plus a text column for Group if you have it. The gantt chart draws as you type. Then pick a look and a size and download it as SVG or PNG.
- When should I use a gantt chart?
- Plan tasks against time and see where they overlap. It belongs to the change over time family of charts, which show how values rise, fall and repeat over time. For single-date events rather than durations, use a Timeline. For numeric values over time, a Line chart or Column timeline applies.
- Is this gantt chart maker free?
- Yes. It is free with no sign-up, your data stays in your browser, and you can download the gantt chart as SVG or PNG.