Burndown chart maker

Track the work left in a sprint against the ideal pace to zero.

Needs a number, date or text column for Day and one or more number columns for Ideal and remaining.

Need a dashboard or a data story?

We design and build them with charts drawn for your brand, not a library's defaults.

  • Product dashboards Analytics and admin views your customers open every day.
  • Reports and data stories Investor updates, annual reports and research that read in one pass.
  • Data-heavy websites Interactive charts, maps and calculators built into your site.

How to make a burndown chart

  1. Paste your data

    Paste cells from a spreadsheet or upload a CSV with a number, date or text column for Day and one or more number columns for Ideal and remaining.

  2. Check the columns

    The burndown chart picks its columns for you. Change any of them under Data.

  3. Style it and download

    Under Style, pick a look, colours, background and size, add a title and source, then download SVG or PNG.

What is a burndown chart?

A burndown chart tracks the work left in a sprint or project day by day against an ideal line that falls steadily to zero by the end date. It tells a team early whether they will finish on time.

How to read it

The dashed line is the ideal pace and the solid line is the work actually remaining. When the solid line sits above the dashed one, the team is behind; below it, ahead. A flat stretch means no work was finished on those days.

When to use it

Track the work left in a sprint against the ideal pace to zero. It is one of the change over time charts, which show how values rise, fall and repeat over time.

When scope is added or removed during the sprint, a burndown hides it inside the remaining line, so use a Burnup chart. For long projects measured weekly, a Line chart of progress against plan works as well.

Tips for a better burndown chart

  • Name the reference column Ideal so it is drawn as the dashed guide line, and the other column Remaining.
  • Measure work in one unit throughout, such as story points or hours, and record it at the same time each day.
  • Leave future days blank in the Remaining column so the line stops at today instead of dropping to zero.

Data you need

One row per item with a number, date or text column for Day and one or more number columns for Ideal and remaining. Column names can be anything; the chart maker matches columns by type, and you can change the match under Data.

DayIdealRemaining
08080
17280
26476
35671
44866
54058
63249
72441
Download the sample CSV

Questions, answered

What is a burndown chart?
A burndown chart tracks the work left in a sprint or project day by day against an ideal line that falls steadily to zero by the end date. It tells a team early whether they will finish on time.
How do you read a burndown chart?
The dashed line is the ideal pace and the solid line is the work actually remaining. When the solid line sits above the dashed one, the team is behind; below it, ahead. A flat stretch means no work was finished on those days.
How do I make a burndown chart?
Paste your data into the chart maker with a number, date or text column for Day and one or more number columns for Ideal and remaining. The burndown chart draws as you type. Then pick a look and a size and download it as SVG or PNG.
When should I use a burndown chart?
Track the work left in a sprint against the ideal pace to zero. It belongs to the change over time family of charts, which show how values rise, fall and repeat over time. When scope is added or removed during the sprint, a burndown hides it inside the remaining line, so use a Burnup chart. For long projects measured weekly, a Line chart of progress against plan works as well.
Is this burndown chart maker free?
Yes. It is free with no sign-up, your data stays in your browser, and you can download the burndown chart as SVG or PNG.