Add data

Chart type

All 206 charts

Run chart maker

Track a measure against its median to spot shifts after a change.

Needs a date, number or text column for Time or sample and a number column for Value.

Need a dashboard or a data story?

We design and build them with charts drawn for your brand, not a library's defaults.

  • Product dashboards Analytics and admin views your customers open every day.
  • Reports and data stories Investor updates, annual reports and research that read in one pass.
  • Data-heavy websites Interactive charts, maps and calculators built into your site.

How to make a run chart

  1. Paste your data

    Paste cells from a spreadsheet or upload a CSV with a date, number or text column for Time or sample and a number column for Value.

  2. Check the columns

    The run chart picks its columns for you. Change any of them under Data.

  3. Style it and download

    Under Style, pick a look, colours, background and size, add a title and source, then download SVG or PNG.

What is a run chart?

A run chart plots a measure in time order with a horizontal line at its median. It is a quick, assumption-light way to see whether a change to a process has moved the results.

How to read it

Points connected in sequence show the path of the measure, and the dashed line marks the median of all points. Six or more consecutive points on one side of the median is a shift, highlighted here, and suggests a real change rather than noise. Too few runs (crossings of the median) for the number of points is another sign of a non-random pattern.

When to use it

Track a measure against its median to spot shifts after a change. It is one of the change over time charts, which show how values rise, fall and repeat over time.

If you need statistical limits to judge single unusual points, use a Control chart. For comparing several series over time, a Line chart is clearer.

Tips for a better run chart

  • Aim for at least 10 to 12 points before reading shifts, since short series can show patterns by chance.
  • Skip points that sit exactly on the median when counting a run; they neither break nor extend it.
  • Annotate when the change was made so readers can compare the points before and after it.

Data you need

One row per item with a date, number or text column for Time or sample and a number column for Value. Column names can be anything; the chart maker matches columns by type, and you can change the match under Data.

WeekMedian wait (min)
2026-01-0547
2026-01-1244
2026-01-1949
2026-01-2650
2026-02-0252
2026-02-0945
2026-02-1649
2026-02-2345
Download the sample CSV

Questions, answered

What is a run chart?
A run chart plots a measure in time order with a horizontal line at its median. It is a quick, assumption-light way to see whether a change to a process has moved the results.
How do you read a run chart?
Points connected in sequence show the path of the measure, and the dashed line marks the median of all points. Six or more consecutive points on one side of the median is a shift, highlighted here, and suggests a real change rather than noise. Too few runs (crossings of the median) for the number of points is another sign of a non-random pattern.
How do I make a run chart?
Paste your data into the chart maker with a date, number or text column for Time or sample and a number column for Value. The run chart draws as you type. Then pick a look and a size and download it as SVG or PNG.
When should I use a run chart?
Track a measure against its median to spot shifts after a change. It belongs to the change over time family of charts, which show how values rise, fall and repeat over time. If you need statistical limits to judge single unusual points, use a Control chart. For comparing several series over time, a Line chart is clearer.
Is this run chart maker free?
Yes. It is free with no sign-up, your data stays in your browser, and you can download the run chart as SVG or PNG.