Burnup chart maker

Track completed work against total scope, so scope changes stay visible.

Needs a number, date or text column for Day and one or more number columns for Scope and completed.

Need a dashboard or a data story?

We design and build them with charts drawn for your brand, not a library's defaults.

  • Product dashboards Analytics and admin views your customers open every day.
  • Reports and data stories Investor updates, annual reports and research that read in one pass.
  • Data-heavy websites Interactive charts, maps and calculators built into your site.

How to make a burnup chart

  1. Paste your data

    Paste cells from a spreadsheet or upload a CSV with a number, date or text column for Day and one or more number columns for Scope and completed.

  2. Check the columns

    The burnup chart picks its columns for you. Change any of them under Data.

  3. Style it and download

    Under Style, pick a look, colours, background and size, add a title and source, then download SVG or PNG.

What is a burnup chart?

A burnup chart tracks completed work rising toward a total scope line over the days of a sprint or project. Because scope has its own line, it shows when work was added as well as when it was finished.

How to read it

The stepped line is the total scope and the solid line is the work completed. The gap between them is what is left. A jump in the scope line marks work added mid-sprint, and the project is done when the two lines meet.

When to use it

Track completed work against total scope, so scope changes stay visible. It is one of the change over time charts, which show how values rise, fall and repeat over time.

When scope is fixed and the team only needs to see the remaining work, a Burndown chart is simpler. To compare velocity across many sprints, use a Column chart of points completed per sprint.

Tips for a better burnup chart

  • Name the scope column Scope or Total so it is drawn as the stepped reference line.
  • Record scope changes on the day they happen, so each step lines up with the decision that caused it.
  • Use the same unit for scope and completed work, such as story points, or the gap means nothing.

Data you need

One row per item with a number, date or text column for Day and one or more number columns for Scope and completed. Column names can be anything; the chart maker matches columns by type, and you can change the match under Data.

DayScopeCompleted
0600
1604
2609
36613
46619
56624
67230
77238
Download the sample CSV

Questions, answered

What is a burnup chart?
A burnup chart tracks completed work rising toward a total scope line over the days of a sprint or project. Because scope has its own line, it shows when work was added as well as when it was finished.
How do you read a burnup chart?
The stepped line is the total scope and the solid line is the work completed. The gap between them is what is left. A jump in the scope line marks work added mid-sprint, and the project is done when the two lines meet.
How do I make a burnup chart?
Paste your data into the chart maker with a number, date or text column for Day and one or more number columns for Scope and completed. The burnup chart draws as you type. Then pick a look and a size and download it as SVG or PNG.
When should I use a burnup chart?
Track completed work against total scope, so scope changes stay visible. It belongs to the change over time family of charts, which show how values rise, fall and repeat over time. When scope is fixed and the team only needs to see the remaining work, a Burndown chart is simpler. To compare velocity across many sprints, use a Column chart of points completed per sprint.
Is this burnup chart maker free?
Yes. It is free with no sign-up, your data stays in your browser, and you can download the burnup chart as SVG or PNG.