116 charts fit this data

Add data

Chart type

All 206 charts

Velocity chart maker

Compare committed and completed story points sprint by sprint.

Needs a text, number or date column for Sprint and one or more number columns for Committed and completed.

Need a dashboard or a data story?

We design and build them with charts drawn for your brand, not a library's defaults.

  • Product dashboards Analytics and admin views your customers open every day.
  • Reports and data stories Investor updates, annual reports and research that read in one pass.
  • Data-heavy websites Interactive charts, maps and calculators built into your site.

How to make a velocity chart

  1. Paste your data

    Paste cells from a spreadsheet or upload a CSV with a text, number or date column for Sprint and one or more number columns for Committed and completed.

  2. Check the columns

    The velocity chart picks its columns for you. Change any of them under Data.

  3. Style it and download

    Under Style, pick a look, colours, background and size, add a title and source, then download SVG or PNG.

What is a velocity chart?

A velocity chart puts the story points a team committed to and the points it completed side by side for each sprint. Teams use it to plan how much to take on next.

How to read it

Each sprint has two bars: committed and completed. When completed keeps falling short of committed, the team is over committing. The average height of the completed bars over the last few sprints is the team velocity.

When to use it

Compare committed and completed story points sprint by sprint. It is one of the magnitude charts, which compare how big things are, side by side.

For progress inside a single sprint, use a Burndown chart or Burnup chart. To spot where work is piling up between states, use a Cumulative flow diagram.

Tips for a better velocity chart

  • Use the same unit every sprint, story points or tickets, and do not change point scales midway.
  • Show at least six sprints so one odd sprint does not drive the reading.
  • Name the sprints in order, such as Sprint 21, Sprint 22, so the bars run left to right in time.

Data you need

One row per item with a text, number or date column for Sprint and one or more number columns for Committed and completed. Column names can be anything; the chart maker matches columns by type, and you can change the match under Data.

SprintCommittedCompleted
Sprint 213428
Sprint 223230
Sprint 233631
Sprint 243030
Sprint 253829
Sprint 263332
Sprint 273534
Sprint 283433
Download the sample CSV

Questions, answered

What is a velocity chart?
A velocity chart puts the story points a team committed to and the points it completed side by side for each sprint. Teams use it to plan how much to take on next.
How do you read a velocity chart?
Each sprint has two bars: committed and completed. When completed keeps falling short of committed, the team is over committing. The average height of the completed bars over the last few sprints is the team velocity.
How do I make a velocity chart?
Paste your data into the chart maker with a text, number or date column for Sprint and one or more number columns for Committed and completed. The velocity chart draws as you type. Then pick a look and a size and download it as SVG or PNG.
When should I use a velocity chart?
Compare committed and completed story points sprint by sprint. It belongs to the magnitude family of charts, which compare how big things are, side by side. For progress inside a single sprint, use a Burndown chart or Burnup chart. To spot where work is piling up between states, use a Cumulative flow diagram.
Is this velocity chart maker free?
Yes. It is free with no sign-up, your data stays in your browser, and you can download the velocity chart as SVG or PNG.